help Dana Mercer
D
info This is a demonstration of Foudra MRP. Try anything you like: nothing you change is saved. Get help on using Foudra MRP Use Foudra for your own business
Parts chevron_right 310-000001-00
photo_library

Images

image

No images yet

0 of 5 images.

Add image

…or drop an image here
tag

Identity

Category 310 — Welded Subassemblies
Stock number 000001
Version 00
Type sub_assembly
inventory

Stock policy

On hand (all locations) 7.0000
On order 0
Can build 18 (limited by Head tube, 44 mm tapered)
Unit each
Stocked Yes
Minimum stock 2.0000
Maximum stock 10.0000
Lead time 7 days
Standard cost 124.0000
warehouse

Stock by location

Location Name On hand Updated
WH1-C Aisle C 7.0000 2026-09-04 13:28 UTC
local_shipping

Where we buy it

Sourcing →
Supplier Their number Price MOQ / pack Lead time
No suppliers mapped — open Sourcing to add one and make this part orderable.
account_tree

Bill of materials

Edit →
# Component Name Qty per Reference On hand
1 100-000001-00 Aluminium tube 6061-T6, 38.0 x 1.6 mm 0.6200 metre down tube 56.0000
2 100-000002-00 Aluminium tube 6061-T6, 31.8 x 1.6 mm 1.1500 metre top tube, seat tube 48.0000
3 320-000005-00 Head tube, 44 mm tapered 1.0000 each — 18.0000
4 320-000004-00 Bottom bracket shell, BSA 73 1.0000 each — 18.0000
5 110-000008-00 Bottle boss M5, weld-in 2.0000 each bottle bosses 400.0000
route

Routing

Edit →
# Step Group Setup Run / unit Batch
10 Tack in jig Welding 20 min 30.00 min —
20 Weld out Welding 5 min 45.00 min —
Total 2 steps, one after another 25 min 75 min
call_split

Where used

Used in Name Type Qty per parent Reference
300-000001-00 Frame, Trail 29 - Medium sub_assembly 1.0000 —
receipt_long

Recent movements

When Type Location Δ Qty By Notes
2026-08-04 13:28 UTC production_receipt WH1-C 7.0000 Owen Brady Built in house
history

Record

Created 2026-09-04 13:28 UTC
Updated 2026-09-04 13:28 UTC
Archived —