Planning

What the demand, the reorder points and the bills of materials say should be made or bought, after what is on hand, on order and already being made. Last run 2026-10-05 01:45 UTC.

eventDemand
Do Pri Part Name Qty Needed by Release by From Why
buy 1 220-000009-00 Tyre Maxxis Minion DHF 29 x 2.5 4 each 2026-08-25 2026-07-11 Maxxis International for 310-000006-00 Wheel, 29 inch front, complete ×4; for 310-000007-00 Wheel, 29 inch rear, complete ×6
buy 1 220-000009-00 Tyre Maxxis Minion DHF 29 x 2.5 4 each 2026-09-04 2026-07-21 Maxxis International for WO-00002 ×2
buy 1 220-000008-00 Nipples, brass 12 mm 100 each 2026-08-25 2026-07-26 Alpine Wheel Components AG for 310-000006-00 Wheel, 29 inch front, complete ×4; for 310-000007-00 Wheel, 29 inch rear, complete ×6
buy 1 220-000008-00 Nipples, brass 12 mm 100 each 2026-09-04 2026-08-05 Alpine Wheel Components AG for WO-00002 ×2
buy 1 200-000001-00 Shimano Deore XT M8100 rear derailleur, 12s 2 each 2026-08-28 2026-08-07 Shimano Europe BV for WO-00003 ×6
buy 1 200-000003-00 Cassette 12-speed, 10-51T 2 each 2026-08-28 2026-08-07 Shimano Europe BV for WO-00003 ×6
buy 1 200-000005-00 Crankset 32T, 170 mm 2 each 2026-08-28 2026-08-07 Shimano Europe BV for WO-00003 ×6
make 1 300-000001-00 Frame, Trail 29 - Medium 4 each 2026-08-28 2026-08-14 routing for WO-00003 ×6
make 1 310-000006-00 Wheel, 29 inch front, complete 4 each 2026-08-28 2026-08-25 routing for WO-00003 ×6
make 1 310-000007-00 Wheel, 29 inch rear, complete 6 each 2026-08-28 2026-08-25 routing for WO-00003 ×6
buy 4 100-000003-00 Aluminium tube 6061-T6, 28.6 x 1.4 mm 24 metre — — AluTube Supplies Ltd reorder point 30
buy 4 100-000005-00 Aluminium tube 7005, 44.0 x 2.0 mm 12 metre — — AluTube Supplies Ltd reorder point 25
buy 4 110-000001-00 Bolt M5 x 16, socket cap, A4 100 each — — FastFix Fasteners reorder point 400
buy 4 110-000004-00 Nut M5 nyloc, A4 200 each — — FastFix Fasteners reorder point 400
buy 4 110-000005-00 Washer M5 form A, A4 250 each — — FastFix Fasteners reorder point 500
buy 4 120-000003-00 Bearing 608-2RS sealed 20 each — — The Bearing Company (UK) Ltd reorder point 30
buy 4 200-000001-00 Shimano Deore XT M8100 rear derailleur, 12s 6 each — — Shimano Europe BV reorder point 6
buy 4 200-000003-00 Cassette 12-speed, 10-51T 6 each — — Shimano Europe BV reorder point 6
buy 4 200-000004-00 Chain 12-speed, 126 links 10 each — — KMC Chain Industrial reorder point 10
buy 4 200-000005-00 Crankset 32T, 170 mm 6 each — — Shimano Europe BV reorder point 6
buy 4 200-000011-00 Chain 8-speed, kids 10 each — — KMC Chain Industrial reorder point 8
buy 4 210-000001-00 Shimano MT200 hydraulic brake set 8 each — — Shimano Europe BV reorder point 8
buy 4 210-000003-00 Brake rotor 180 mm, 6-bolt 10 each — — Shimano Europe BV reorder point 12
buy 4 210-000005-00 Brake pads, resin, B01S 10 each — — Shimano Europe BV reorder point 20
buy 4 220-000008-00 Nipples, brass 12 mm 500 each — — Alpine Wheel Components AG reorder point 400; for 310-000006-00 Wheel, 29 inch front, complete ×2; for 310-000007-00 Wheel, 29 inch rear, complete ×2
buy 4 220-000009-00 Tyre Maxxis Minion DHF 29 x 2.5 12 each — — Maxxis International reorder point 10; for 310-000006-00 Wheel, 29 inch front, complete ×2; for 310-000007-00 Wheel, 29 inch rear, complete ×2
buy 4 220-000012-00 Inner tube 29 x 2.2 30 each — — Maxxis International reorder point 20; for 310-000006-00 Wheel, 29 inch front, complete ×2; for 310-000007-00 Wheel, 29 inch rear, complete ×2
buy 4 230-000001-00 Handlebar, alloy 780 x 31.8 mm 8 each — — no supplier reorder point 8
buy 4 230-000005-00 Grips, lock-on 10 each — — Selle Componenti SpA reorder point 12
buy 4 240-000001-00 RockShox 35 Gold RL fork, 140 mm, 29 1 each — — SRAM Europe GmbH reorder point 4
buy 4 240-000003-00 Rigid fork, kids 20 inch, alloy 2 each — — no supplier reorder point 6
buy 4 250-000001-00 Saddle, MTB performance 8 each — — Selle Componenti SpA reorder point 8
buy 4 250-000003-00 Dropper post 31.6 x 150 mm 1 each — — no supplier reorder point 4
make 4 310-000006-00 Wheel, 29 inch front, complete 2 each — — routing reorder point 2
make 4 310-000007-00 Wheel, 29 inch rear, complete 2 each — — routing reorder point 2
buy 4 500-000001-00 Powder coat, matte black RAL 9005 5 kg — — PaintPro Coatings Ltd reorder point 10
buy 4 500-000005-00 Decal set, Trail series 25 each — — PaintPro Coatings Ltd reorder point 20

Ticked makes become draft work orders, one each; ticked buys become draft purchase orders, one per supplier. Nothing is released or sent from here. Components are indented under what needs them.

Capacity

precision_manufacturing

ASSY — Assembly

2 stations · 8 h/day · 1 job · 1 late
WO-00001 · Clean up finishes 5 Oct, due 9 Sep.
precision_manufacturing

PAINT — Paint shop

1 station · 8 h/day · 1 job · 1 late
planned · Frame, Trail 29 - Medium ×4 · Powder coat finishes 5 Oct, due 28 Aug.
precision_manufacturing

PRINT — Print farm

3 stations · 8 h/day · 1 job · 1 late
WO-00001 · Print finishes 5 Oct, due 9 Sep.
5 Oct 6 Oct 7 Oct 8 Oct 9 Oct 10 Oct 11 Oct 12 Oct 13 Oct WO-00001 · Print: 5 Oct → 5 Oct, due 9 Sep, station 1, 7.2 h WO-00001 · Print
precision_manufacturing

WELD — Welding

2 stations · 8 h/day · 1 job · 1 late
planned · Frame, Trail 29 - Medium ×4 · Weld triangles finishes 5 Oct, due 28 Aug.
precision_manufacturing

WHEEL — Wheel building

3 stations · 8 h/day · 20 jobs · 12 late
planned · Wheel, 29 inch front, complete ×4 · Hub build finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch front, complete ×4 · Lacing finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch front, complete ×4 · Truing finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch front, complete ×4 · Tyre fitting finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch rear, complete ×6 · Hub build finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch rear, complete ×6 · Lacing finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch rear, complete ×6 · Truing finishes 5 Oct, due 28 Aug.
planned · Wheel, 29 inch rear, complete ×6 · Tyre fitting finishes 5 Oct, due 28 Aug.
WO-00002 · Hub build finishes 5 Oct, due 7 Sep.
WO-00002 · Lacing finishes 5 Oct, due 7 Sep.
WO-00002 · Truing finishes 5 Oct, due 7 Sep.
WO-00002 · Tyre fitting finishes 5 Oct, due 7 Sep.
5 Oct 6 Oct 7 Oct 8 Oct 9 Oct 10 Oct 11 Oct 12 Oct 13 Oct planned · Wheel, 29 inch front, complete ×4 · Hub build: 5 Oct → 5 Oct, due 28 Aug, station 1, 0.9 h planned · Wheel, 29 inch front, complete ×4 · Hub build planned · Wheel, 29 inch front, complete ×4 · Lacing: 5 Oct → 5 Oct, due 28 Aug, station 2, 1.8 h planned · Wheel, 29 inch front, complete ×4 · Lacing planned · Wheel, 29 inch front, complete ×4 · Truing: 5 Oct → 5 Oct, due 28 Aug, station 3, 1.0 h planned · Wheel, 29 inch front, complete ×4 · Truing planned · Wheel, 29 inch front, complete ×4 · Tyre fitting: 5 Oct → 5 Oct, due 28 Aug, station 1, 0.4 h planned · Wheel, 29 inch front, complete ×4 · Tyre fitting planned · Wheel, 29 inch rear, complete ×6 · Hub build: 5 Oct → 5 Oct, due 28 Aug, station 3, 1.3 h planned · Wheel, 29 inch rear, complete ×6 · Hub build planned · Wheel, 29 inch rear, complete ×6 · Lacing: 5 Oct → 5 Oct, due 28 Aug, station 1, 2.7 h planned · Wheel, 29 inch rear, complete ×6 · Lacing planned · Wheel, 29 inch rear, complete ×6 · Truing: 5 Oct → 5 Oct, due 28 Aug, station 2, 1.5 h planned · Wheel, 29 inch rear, complete ×6 · Truing planned · Wheel, 29 inch rear, complete ×6 · Tyre fitting: 5 Oct → 5 Oct, due 28 Aug, station 3, 0.6 h planned · Wheel, 29 inch rear, complete ×6 · Tyre fitting WO-00002 · Hub build: 5 Oct → 5 Oct, due 7 Sep, station 3, 0.5 h WO-00002 · Hub build WO-00002 · Lacing: 5 Oct → 5 Oct, due 7 Sep, station 2, 1.0 h WO-00002 · Lacing WO-00002 · Truing: 5 Oct → 5 Oct, due 7 Sep, station 3, 0.5 h WO-00002 · Truing WO-00002 · Tyre fitting: 5 Oct → 5 Oct, due 7 Sep, station 3, 0.2 h WO-00002 · Tyre fitting planned · Wheel, 29 inch front, complete ×2 · Hub build: 5 Oct → 5 Oct, station 1, 0.5 h planned · Wheel, 29 inch front, complete ×2 · Hub build planned · Wheel, 29 inch front, complete ×2 · Lacing: 5 Oct → 5 Oct, station 3, 1.0 h planned · Wheel, 29 inch front, complete ×2 · Lacing planned · Wheel, 29 inch front, complete ×2 · Truing: 5 Oct → 5 Oct, station 2, 0.5 h planned · Wheel, 29 inch front, complete ×2 · Truing planned · Wheel, 29 inch front, complete ×2 · Tyre fitting: 5 Oct → 5 Oct, station 1, 0.2 h planned · Wheel, 29 inch front, complete ×2 · Tyre fitting planned · Wheel, 29 inch rear, complete ×2 · Hub build: 5 Oct → 5 Oct, station 1, 0.5 h planned · Wheel, 29 inch rear, complete ×2 · Hub build planned · Wheel, 29 inch rear, complete ×2 · Lacing: 5 Oct → 5 Oct, station 2, 1.0 h planned · Wheel, 29 inch rear, complete ×2 · Lacing planned · Wheel, 29 inch rear, complete ×2 · Truing: 5 Oct → 5 Oct, station 3, 0.5 h planned · Wheel, 29 inch rear, complete ×2 · Truing planned · Wheel, 29 inch rear, complete ×2 · Tyre fitting: 5 Oct → 5 Oct, station 1, 0.2 h planned · Wheel, 29 inch rear, complete ×2 · Tyre fitting

Open orders in blue, proposals in grey, late in red; the tick on a bar is its due date. Jobs run in priority then due order, back to back, on whichever station frees first, seven days a week. Set each group's hours per day on its page.