info This is a demonstration of Foudra MRP. Try anything you like: nothing you change is saved. Get help on using Foudra MRP Use Foudra for your own business
Work orderschevron_rightWO-00002

WO-00002 — 2.0000 × Wheel, 29 inch front, complete

310-000006-00 priority 1 due 2026-09-07
released
more_vert
account_treeBOM data_objectCustom data
info

Order

Makes310-000006-00 Wheel, 29 inch front, complete
Done0 of 2.0000 each
Reference
Released2026-09-03 13:28 UTC
Completed—
NotesFront wheels, Trail 29 Comp order.
build

Extra parts

· drawn from stores outside the bill of materials

For a part this job needed that its bill of materials does not list: a replacement fitted during a service, something broken on assembly. Taken from the order's component location; a part with a minimum stock is re-planned on the next run.

10

Hub build

· Wheel building pending 0 / 2.0000
ConsumesPer unitStill requiredOn hand here
220-000005-00 Hub, front 15 x 110 Boost 1.0000 each2.0000 18.0000
120-000001-00 Bearing 6902-2RS sealed 2.0000 each4.0000 0 short
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
20

Lacing

· Wheel building pending 0 / 2.0000
ConsumesPer unitStill requiredOn hand here
220-000001-00 Rim 29 inch, 32h, tubeless 1.0000 each2.0000 6.0000
220-000007-00 Spokes, 2.0 mm plain gauge, 264 mm 32.0000 each64.0000 0 short
220-000008-00 Nipples, brass 12 mm 32.0000 each64.0000 0 short
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
30

Truing

· Wheel building pending 0 / 2.0000

Consumes nothing — pure labour.

Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
40

Tyre fitting

· Wheel building pending 0 / 2.0000
ConsumesPer unitStill requiredOn hand here
220-000009-00 Tyre Maxxis Minion DHF 29 x 2.5 1.0000 each2.0000 1.0000 short
220-000012-00 Inner tube 29 x 2.2 1.0000 each2.0000 12.0000
220-000014-00 Tubeless valve, 44 mm 1.0000 each2.0000 70.0000
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.