Work orderschevron_rightWO-00012

WO-00012 — 2 × Wheel, 29 inch front, complete

310-000006-00 priority 1 due 2026-11-07
released
more_vert
account_treeBOM data_objectCustom data
schedule Due 2026-11-07; the schedule predicts it finished Wed 4 Nov (starting Wed 4 Nov 08:13)
info

Work order

Makes310-000006-00 Wheel, 29 inch front, complete
Done0 of 2 each
Reference
Released2026-11-03 02:00 UTC
Completed—
NotesFront wheels, Trail 29 Comp order.
build

Extra parts

· drawn from stores outside the bill of materials

For a part this job needed that its bill of materials does not list: a replacement fitted during a service, something broken on assembly. Taken from the order's component location; a part with a minimum stock is re-planned on the next run.

10

Hub build

· Wheel building pending 0 / 2
ConsumesPer unitStill requiredOn hand here
220-000005-00 Hub, front 15 x 110 Boost 1 each2 18
120-000001-00 Bearing 6902-2RS sealed 2 each4 0 short
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
20

Lacing

· Wheel building pending 0 / 2
ConsumesPer unitStill requiredOn hand here
220-000001-00 Rim 29 inch, 32h, tubeless 1 each2 6
220-000007-00 Spokes, 2.0 mm plain gauge, 264 mm 32 each64 0 short
220-000008-00 Nipples, brass 12 mm 32 each64 0 short
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
30

Truing

· Wheel building pending 0 / 2

Consumes nothing — pure labour.

Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
40

Tyre fitting

· Wheel building pending 0 / 2
ConsumesPer unitStill requiredOn hand here
220-000009-00 Tyre Maxxis Minion DHF 29 x 2.5 1 each2 1 short
220-000012-00 Inner tube 29 x 2.2 1 each2 12
220-000014-00 Tubeless valve, 44 mm 1 each2 70
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.