Foudra MRP
help
D
info This is a demonstration of Foudra MRP. Try anything you like: nothing you change is saved. Get help on using Foudra MRP Use Foudra for your own business
Work orderschevron_rightWO-00011

WO-00011 — 12 × Cable guide, internal routing

330-000001-00 priority 2 due 2026-11-09
released
more_vert
account_treeBOM data_objectCustom data
schedule Due 2026-11-09; the schedule predicts it finished Wed 4 Nov (starting Wed 4 Nov 06:03)
info

Work order

Makes330-000001-00 Cable guide, internal routing
Done0 of 12 each
Reference
Released2026-11-03 02:00 UTC
Completed—
NotesCable guides for the Trail run.
build

Extra parts

· drawn from stores outside the bill of materials

For a part this job needed that its bill of materials does not list: a replacement fitted during a service, something broken on assembly. Taken from the order's component location; a part with a minimum stock is re-planned on the next run.

10

Print

· Print farm ready 0 / 12
ConsumesPer unitStill requiredOn hand here
500-000007-00 PETG filament, 1.75 mm, black 0.012 kg0.144 18.8
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
20

Clean up

· Assembly pending 0 / 12

Consumes nothing — pure labour.

Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.