Work orderschevron_rightWO-00011

WO-00011 — 12.0000 × Cable guide, internal routing

330-000001-00 priority 2 due 2026-10-16
released
more_vert
account_treeBOM data_objectCustom data
schedule Due 2026-10-16; the schedule predicts it finished Mon 12 Oct (starting Sun 11 Oct 23:28)
info

Order

Makes330-000001-00 Cable guide, internal routing
Done0 of 12.0000 each
Reference
Released2026-10-10 01:00 UTC
Completed—
NotesCable guides for the Trail run.
build

Extra parts

· drawn from stores outside the bill of materials

For a part this job needed that its bill of materials does not list: a replacement fitted during a service, something broken on assembly. Taken from the order's component location; a part with a minimum stock is re-planned on the next run.

10

Print

· Print farm ready 0 / 12.0000
ConsumesPer unitStill requiredOn hand here
500-000007-00 PETG filament, 1.75 mm, black 0.0120 kg0.1440 14.0000
Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.
20

Clean up

· Assembly pending 0 / 12.0000

Consumes nothing — pure labour.

Scrap…

A run that made nothing: materials for the quantity are consumed, nothing is produced, the count stays.

Completing issues this step's materials from the component location; the last step receives the output.