demand #20 (Cycle Hub Galway, order 4471): 8 × 400-000001-00 Trail 29 Comp - Medium, due 23 Oct, will be ready about Thu 26 Nov — waiting for WO-00013 Trail 29 Comp - Medium, predicted 26 Nov; behind that, proposed make Wheel, 29 inch rear, complete is waiting for Tyre Maxxis Minion DHF 29 x 2.5: a proposed buy from Maxxis International, not ordered yet, 45 days' lead.
and 50 more →
WO-00011 — 12.0000 × Cable guide, internal routing
schedule
Due 2026-10-16; the schedule predicts it finished
Mon 12 Oct
(starting Sun 11 Oct 23:28)
info
Order
| Makes | 330-000001-00 Cable guide, internal routing |
|---|---|
| Done | 0 of 12.0000 each |
| Reference | |
| Released | 2026-10-10 01:00 UTC |
| Completed | — |
| Notes | Cable guides for the Trail run. |
build
Extra parts
· drawn from stores outside the bill of materialsFor a part this job needed that its bill of materials does not list: a replacement fitted during a service, something broken on assembly. Taken from the order's component location; a part with a minimum stock is re-planned on the next run.
10
Print
· Print farm ready 0 / 12.0000
| Consumes | Per unit | Still required | On hand here |
|---|---|---|---|
| 500-000007-00 PETG filament, 1.75 mm, black | 0.0120 kg | 0.1440 | 14.0000 |
Scrap…
20
Clean up
· Assembly pending 0 / 12.0000Consumes nothing — pure labour.